翻訳と辞書
Words near each other
・ Gürümze, Feke
・ Gürün
・ Güshi Khan
・ Güssefeld
・ Güssenburg Castle
・ Güssing
・ Güssing District
・ Güsten
・ Güster
・ Güstrow
・ Güstrow (district)
・ Güstrow Cathedral
・ Güstrow Palace
・ Güstrow Solarpark
・ Güstrow-Land
Güstrow–Schwaan railway
・ Gütenbach
・ Güterglück
・ Gütersloh
・ Gütersloh (disambiguation)
・ Gütersloh (district)
・ Gütersloh Hauptbahnhof
・ Gütsch
・ Gütschbahn funicular
・ Gütschow
・ Güttenbach
・ Güttersbach (Crumbach)
・ Güttingen
・ Güttler
・ Gützkow


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Güstrow–Schwaan railway : ウィキペディア英語版
Güstrow–Schwaan railway

|}
The Güstrow–Schwaan railway is a single-track, electrified main line in the German state of Mecklenburg-Vorpommern.
== History ==

In 1850, a branch was opened from the Bad Kleinen–Rostock railway in Bützow to Güstrow. In the following years the network was further expanded, including a connection from Güstrow to Neubrandenburg opened in 1864, which was extended to Stettin (now Szczecin in Poland) in 1867. The line from Gustrow to Plau was opened in 1882. What was still missing was a direct connection between Rostock and Güstrow, the largest and the fourth largest towns in the Grand Duchy of Mecklenburg-Schwerin. The Neustrelitz–Warnemünde railway (Lloyd Railway) was put into operation in 1886, connecting Rostock with Neustrelitz and Berlin, but bypassing Güstrow. A year later, two lines between Rostock and Güstrow emerged almost simultaneously. On the one hand, the Priemerburg–Plaaz railway was built by the Güstrow Plau Railway ((ドイツ語:Güstrow-Plauer Eisenbahn)), which provided a connection to Rostock via the Lloyd Railway. On the other hand, a state line was built by the Grand Duchy to Schwaan on the Bad Kleinen–Rostock railway. Originally the line was controlled from Schwiesow and Rukieten on the existing main lines, but by the end of the 19th century the line was controlled from local signal boxes in the stations of Güstrow and Schwaan.
In addition to local traffic, the line was significant for long-distance traffic. From 1895, trains from Berlin to Rostock and Copenhagen ran via Güstrow instead of on the direct route via Plaaz on the Lloyd Railway.
After the Second World War, the Lloyd Railway south of Plaaz was dismantled as reparations to the Soviet Union. As a result, after the reconstruction in 1948 of the Schwaan–Rostock line, which had also been dismantled for reparations, the Güstrow–Schwaan line became an important route for passenger and freight traffic. The traffic between Berlin and Rostock ran via Neubrandenburg and Güstrow. The route via Karow served as an alternate route. Güstrow station was rebuilt from 1952 to 1954 because of the increased freight traffic. The first relay interlocking of the ''Reichsbahndirektion'' (railway division) of Schwerin went into operation there in 1954.
Even after the reconstruction of the Lloyd Railway in 1960, the route was particularly important for long-distance services between Rostock and Berlin with more than half of the Durchgangszug (express) trains continued to run via Güstrow. The line was electrified in May 1985.
Since 1998, local trains running between Rostock and Güstrow have been included in the Rostock S-Bahn network. In subsequent years, the line speed was raised to 120 km/h and the last crossing opportunity located in former Mistorf station was removed.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Güstrow–Schwaan railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.